Work status as on 9-8-2017, we have completed the following.

  • RCC for Pile cap & Grade beam – completed
  • RCC for Structure – Terrace floor – completed
  • Block Masonry – progressing
  • Wall plastering work – progressing
  • Outside plastering work – BF to Terrace – 98% completed
  • Inside Painting – progressing
  • Outside painting work – progressing

Work status as on 5-7-2017, we have completed the following.

  • Earthwork Excavations – completed
  • RCC for Pile cap & Grade beam – completed
  • RCC for Structure – Terrace floor – progressing
  • Wall plastering work – progressing
  • Outside plastering work – progressing
  • Outside painting work – progressing

Work status as on 9-5-2017, we have completed.

  • Earthwork Excavations – completed
  • RCC for Pile cap & Grade beam – completed
  • Block Masonry – progressing
  • Wall plastering work – progressing
  • Outside plastering work – progressing
  • Outside painting work -progressing